Skip to main content

HYDROVISION International Logo

FEBRUARY 11-13, 2025 | DALLAS, TEXAS
KAY BAILEY HUTCHISON CONVENTION CENTER

 

HVI 2024 Conference Sessions

Default Image

denver generator

Loading

Design Challenges faced in Peterson Dam – 100.0ft x 6.0ft Crest Gate

Jul 18, 2024
Exhibit Floor Booth 127
Poster Gallery

Peterson Station, Milton Station, Clark Falls, and Fairfax Falls make up the 21-MW Lamoille Hydroelectric Project on the Lamoille River. The hydropower plant at Peterson has a production capacity of 6.3 MWe from one unit commissioned in 1948. It is operated by Central Vermont Public Service Corp (CVPS). A previously installed crest gate of 100 ft by 6 ft was used to maintain the water level in river. The gate was damaged and was not able to maintain level in river to run the power station at the desired capacity due to lost water head. CVPS has decided to replace the existing structure, and Rodney Hunt was awarded the responsibility of designing, installing, and commissioning a new crest gate.

 

 

Speakers
Nithyanadham Kankoni Vijayakumar, Senior Engineering Manager - Rodney Hunt Inc
Download Proceedings

Homepage 300x250 1

Homepage 300x250 2


 

Homepage 300x250 3


 

Homepage 300x250 4

.ck-social-icons li a {color: #FFFF !important;}