Loading

1C: Performance Upgrades and Optimization

July 13, 2022
Room 110
Equipment and Technology
Upgrading existing hydro assets can focus on the equipment, the optimization of a single plant, and coordinated control of a larger control area. This session includes three presentations that look at optimizing the monitoring of dam movement using InSAR and geodetic data, optimizing the coordinated control of a multi-unit plant, and coordinated control of multiple plants on the Columbia River in the U.S.
Chairperson
James Volk, Principal Hydro Engineer - Basler Electric Services

300 x 250 Bottom